The U.S. data center buildout is generating a torrent of headlines with numbers that are difficult to compare. One announcement quotes megawatts; another quotes total investment. Cost estimates range from $5 billion to $80 billion per GW depending on what is included in the scope—facility construction only, IT hardware (GPUs and servers), or a fully loaded campus with dedicated power generation. Square footage, acreage, and power capacity are used interchangeably as measures of scale. This tool translates between these metrics using a consistent, source-backed methodology so that individual project announcements, regional forecasts, and national projections can be placed in proper context.
Select a facility type and enter a power capacity below to see derived metrics across both scenarios. For detailed methodology, source citations, and sensitivity analysis, see the Data Center Workbook